ASHRAE Pyramids Chapter Media Center, you can check the available videos of Pyramids Chapter Technology Transfer Committees session, seminars, and Technical Talks, as well as interviews with industry leaders in the HVAC industry in Egypt
ASHRAE is pleased to solicit proposals for 5 new research projects and 3 re-bid projects. The research project titles are listed below.
In all cases, electronic proposal must be in the hands of the ASHRAE MORTS by 8 A.M. EDT, Monday, May 16, 2022, NO EXTENSIONS, NO EXCEPTIONS. The projects are scheduled to begin September 1, 2022, or later.
**Prior to preparing a proposal, please review the sample ASHRAE Research Agreement and General Conditions found on the Research page of the ASHRAE website. If your contracting officer cannot accept this Agreement, please contact us prior to bidding.
1716-TRP, “Oil Concentration of Field Installed Liquid Chillers with Flooded Type Evaporators”
Sponsored by: TC, 8.2 (Centrifugal Machines),
1789-TRP (re-bid), “Optical and Thermal Performance of Hollow Glass Block Units”, Sponsored by: TC 4.5, (Fenestration)
1790-TRP (re-bid), “Distribution of Water Between Vapor and Liquid Phases of Low GWP Refrigerants"; Sponsored by: TC 3.3, (Refrigerant Contaminant Control)
1815-TRP, “Integrating Occupant Behavior Data into Building Information Modeling for Performance Simulation”, Sponsored by: MTG.OBB Occupant Behavior in Buildings, co-sponsored by: MTG.BIM, TC 1.5, (Computer Application), TC 4.7, (Energy Calculations), and TC 7.6, (Building Energy Performance)
1835-TRP (re-bid), “Characterizing the Performance of Induced Flow Stacks”, Sponsored by: TC 9.10, (Laboratory Systems), co-sponsored by: TC4.3, (Ventilation Requirements and Infiltration) and, TC 5.1, (Fans)
1843-TRP, “Validation of Low-Order Acoustic Models of Combustion Driven Oscillations on Fire Tube Water Heaters”, Sponsored by: TC 6.10, (Fuels and Combustion), co-sponsored by: TC 6.6, (Service Water Heating Systems)
1854-TRP, “Database of Ultraviolet Inactivation Rate Constants (k-values) for Microorganisms Critical to System Design”, Sponsored by: TC 2.9, (Ultraviolet Air & Surface Treatment)
1890-TRP, “Minimum flow velocities for purging air and debris from hydronic piping systems”
Sponsored by: TC6.8, (Geothermal Heat Pump and Energy Recovery Applications), co-sponsored by: TC 6.1, (Hydronic and Steam Equipment and Systems) & TC 6.2, (District Energy)